SR. NO |
CLINT/PMC/TPI NAME |
PROJECT NAME |
DURATION (FROM-TO) |
DESCRIPTION |
1 |
M/s IOCL C/O POWER MECH LTD |
M/s IOCL KOYALI- AHEMADNAGAR-SHOLAPUR PIPPELINE (KASPL) 320 KM 18" |
2021-2024 |
TCP DESIGN SUPPLY & SERVICE INSTALLATION TESTING & COMMISIONING 18" 320 KM PIPELINE PROJECT COMPLETED Cross country IOCL Project
|
2 |
M/s BHARAT GAS RESOURCES LTD. |
BGRL 12" 70 Km Temporary Cathodic Protection works at FAZILKA GA BHATINDA PUNJAB |
2024-2025 |
TCP DESIGN SUPPLY & SERVICE INSTALLATION TESTING & COMMISIONING 12" 70 KM PIPELINE
|
3 |
M/s Indraprastha Gas |
Indraprastha Gas Pipeline Pali Rajasthan |
2023-2024 |
10 KM 12" PIPELINE COMPLETED PROJECT
|
4 |
M/s Torrent Gas |
Torrent Gas Pvt Ltd, Dhaulpur 10KM 12" Pipeline |
2022-2023 |
COMPLETED PROJECT
|
5 |
Torrent Gas |
M/s Torrent gas karaikal nagapattinam city gas pipeline tamilnadu |
2024-2025 |
on-going project
|
6 |
M/s ONGC Bokaro (Jharkhand) |
TCP work of ONGC Pipeline Project at Bokaro (Jharkhand) 25 IJ (CGS GGS Pipeline ) 25 KM APPROX |
2023-2024 |
PROJECT COMPLETED
|
7 |
Torrent Gas |
Torrent Gas Pvt Ltd, MATHURA. |
2022-2023 |
COMPLETED
|
8 |
M/s TORRENT GAS |
M/s TORRENT GAS PIPELINE JAIPUR CITY 15 KM 12" & 18" |
2022-2024 |
TORRENT GAS PIPELINE JAIPUR CITY 15 KM 12" & 18" PROJECT COMPLETED
|
9 |
M/S CENTRAL UP GAS LIMITED M/s VICHITRA CONSTRUCTION |
TCP DESIGN SUPPLY AND SERVICE WORK FOR CATHODIC WORK AT JHANSI CENTRAL UP GAS LIMITED |
07.05.2022 - 12.11.2022 |
TEMPORARY CATHODIC PROTECTION SYSTEM DESIGN SUPPLY AND SERVICE TESTING AND COMMISSIONING 10 KM |
10 |
M/s UNM FOUNATION TORRENT GAYPAGLA SURAT |
PCP SUPPLY AND INSTALLATION TR UNIT ANODE BED CATHODIC PROTECTION AT TORRENT SURAT |
20.04.2022 - 20.04.2023 |
PCP SUPPLY AND INSTALLATION TR UNIT ANODE BED CATHODIC PROTECTION AT TORRENT SURAT |
11 |
M/S CENTRAL UP GAS LIMITED C/O M/S PRECISION SYSTEM , M/s VICHITRA CONSTRUCTION |
TCP WORK FOR CATHODIC WORK AT JHANSI |
07.05.2022 - 12.11.2022 |
TEMPORARY CATHODIC PROTECTION SYSTEM DESIGN SUPPLY AND SERVICE 10 KM |
12 |
M/s JAI SHAKTI ENGINEERING & CONSTRUCTION |
CATHODIC WORK AT OUR ADANI PORT MUNDRA VLCC PIPELINE PROJECT, GUJARAT |
19.02.2022 - 19.02.2023 |
WORK ORDER FOR TCP AND PCP WORK AT ADANI PORT MUNDRA VLCC PIPELINE PROJECT 10 KM |
13 |
M/s Indian Oil Corporation Limited C/o Mas constructions Abhay Engineering |
Work order for Temporary cathodic protection for laying of steel pipe line in Ludhiana GA |
29-12-2021- 29-12-2022 |
TEMPORARY CATHODIC PROTECTION SYSTEM DESIGN SUPPLY AND SERVICE. 16.10 KM |
14 |
M/s Bharat Gas Resources Ltd C/O M/s Tolani Projects Pvt. Ltd. |
Laying & construction of 3lpe coated underground pipeline for development of CGD network in Ballari & Gadag GA in the tate of Karnataka spread #1 (Huvinahadagali to Hagaribommanahalli) |
25-11-2021 - 25-11-2022 |
TEMPORARY CATHODIC PROTECTION SYSTEM DESIGN SUPPLY AND SERVICE. 24 KM |
15 |
M/S ADANI GAS LTD C/O SHIVAM INFRA |
TEMPORARY CATHODIC PROTECTION WORKS INCLUDING SUPPY AND INSTALLATION OF ALL CONSUMABLE MATERIAL FOR CGD PROJECT AT GAYA GA |
01-11-2021 - 01-11-2022 |
TEMPORARY CATHODIC PROTECTION WORKS INCLUDING SUPPY AND INSTALLATION OF ALL CONSUMABLE MATERIAL FOR CGD PROJECT AT GAYA GA 9 KM |
16 |
M/s INDIAN OIL CORPORATION LIMITED C/O AL-MUASER PETROLEUM SERVICES PVT. LTD M/S NANDANI INFRA DEVELOPERS |
GROUP F; SHEIKHPURA JAMUI & DEOGHAR GA SPREAD C NID/AMPS/TEPL/IOCL CGD /JAMUI BIHAR/05 |
11-09-2021 - 11-09-2022 |
TEMPORARY CATHODIC PROTECTION SYSTEM DESIGN SUPPLY AND SERVICE FOR LAYING OF CARBON STEEL PIPELINE IN GROUP F; SHEIKHPURA JAMUI & DEOGHAR GA SPREAD C (25 km) |
17 |
M/s. TORRENT GAS PVT LTD C/O A.A AUCTIONEERS & CONTRACTORS PVT. LTD |
TORRENT GAS PVT LTD BASTI. CGD STEEL PIPELINE PROJECT AT BASTI. |
03-09-2021 03-09-2022 |
TEMPORARY CATHODIC PROTECTION SYSTEM DESIGN SUPPLY AND SERVICE (14.24 km) |
18 |
M/s HPOIL Gas Pvt Ltd. C/O MP. ENGG M/S SHREE SAI ENTERPRISES |
HPOIL GAS PVT LTD. CARBON STEEL PIPELINE IN KOLHAPUR IN THE STATE OF MAHARASHTRA. |
27-08-2021- 27-08-2022 |
TEMPORARY CATHODIC PROTECTION SYSTEM DESIGN SUPPLY AND SERVICE (19.10 km) |
19 |
M/s GAIL INDIA LTD. C/O TEPL ANUP ENGINEERING |
GAS AUTHORITY OF INDIA LTD. CGD PIPELINE PATNA |
21-08-2021 - 21-08-2022 |
TEMPORARY CATHODIC PROTECTION SYSTEM DESIGN SUPPLY AND SERVICE (17.2 km) |
20 |
M/s Indian Oil Corporation Limited C/o Mas constructions |
Laying & construction of 3lpe coated Carbon steel pipeline in Arwal,Bhojpur,Jahanabad,Buxer GA-Group b (Naubatpur) |
21-06-2021 - 21-10-2022 |
TEMPORARY CATHODIC PROTECTION SYSTEM DESIGN SUPPLY AND SERVICE. 22 KM |
21 |
M/s BHARAT GAS RESOURCES LIMITED C/O DEO CONSTRUCTION |
BHARAT GAS 3LPE COATED CARBON STEEL 9.900 KM PIPELINE FOR CGD PROJECT IN SHAHDOL & SATNA |
20-06-2021 - 20-06-2022 |
DESIGN, SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND MONITORING OF TEMPORARY CATHODIC PROTECTION FOR LAYING OF 3LPE COATED CARBON STEEL PIPELINE FOR CGD PROJECT IN SHAHDOL (9.900 KM) |
22 |
M/s TECHNO GLOBAL PVT. LTD C/O SKY INFRA |
TCP WORK LAYING OF 3LPE COATED STEEL PIPELINE IN GORAKHPUR-GA 17.5 KM |
20-02-2021 - 20-06-2022 |
TEMPORARY CATHODIC PROTECTION SYSTEM SUPPLY AND SERVICE DESIGN, SUPPLY, INSTALLATION, TESTING, COMMISSIONING LAYING OF 3LPE COATED STEEL PIPELINE IN GORAKHPURGA 17.5 KM |
23 |
M/s INDIAN OIL CORPORATION LIMITED C/O AL-MUASER PETROLEUM SERVICES PVT. LTD |
IOCL KOYALI- AHMEDNAGAR SOLAPUR KASPL PROJECT |
14-02-2021 - 14-02-2022 |
TEMPORARY CATHODIC PROTECTION SYSTEM DESIGN SUPPLY AND SERVICE (46 km) |
24 |
M/s TORRENT GAS PVT LTD.C/O ONIX ENCLAVE PVT .LTD |
TORRENT GAS PROTECTION GAS PVT. LTD. AZAMGADH (UP) |
31-01-2021 - 30-04-2022 |
TEMPORARY CATHODIC PROTECTION SYSTEM DESIGN SUPPLY AND SERVICE 14 KM |
25 |
M/s BHARAT GAS RESOURCES LTD & C/O MAS CONSTRUCTION |
TCP FOR LAYING OF CVARBON STEEL PIPELINE IN SANGLI GA IN MAHARASTRA GA |
25-06-2020 - 30-12-2022 |
TEMPORARY CATHODIC PROTECTION SYSTEM DESIGN SUPPLY AND SERVICE 21 KM |
26 |
M/s HINDUSTAN OIL & GAS PVT LTD C/O MAS CONSTRUCTION |
TCP FOR LAYING OF CVARBON STEEL PIPELINE IN KOLHAPUR GA IN MAHARASTRA GA |
25-06-2020- 30-12-2022 |
TEMPORARY CATHODIC PROTECTION SYSTEM DESIGN SUPPLY AND SERVICE 41.5 KM |
27 |
IOCL KOYALI- AHMEDNAGAR SOLAPUR KASPL PROJECT MAHARASTRA |
M/s INDIAN OIL CORPORATION LIMITED C/O DEZHOU SHENGLI PIPELINE CROSSING ENGINEERING INDIA PVT LTD |
25-06-2020 - 30-12-2021 |
9 NO HDD RIVER CROSSING TCP WORK SUPPLY AND SERVICE |
28 |
M/s. TORRENT GAS PVT LTD C/O ONIX ENCLAVE PVT .LTD |
TORRENT GAS PROTECTION GAS PVT. LTD. AZAMGADH (UP) |
19-06-2020 - 30-04-2022 |
TEMPORARY CATHODIC PROTECTION SYSTEM DESIGN SUPPLY AND SERVICE 13.5 KM |
29 |
M/S INDIAN OIL CORPORATION LIMITED C/O ADVANCE INFRASRTUCTURE PVT LTD |
IOCL KOYALI DUMAD PIPELINE PROJECT |
09-06-2020- 30-12-2020 |
TEMPORARY CATHODIC PROTECTION SYSTEM SUPPLY AND SERVICE DESIGN, SUPPLY, INSTALLATION, TESTING, COMMISSIONING SYSTEM 11KM 5 NO LINE TOTAL 55KM |
30 |
M/S INDIAN OIL CORPORATION LIMITED C/O AL-MUASER PETROLEUM SERVICES PVT. LTD |
IOCL KOYALI- AHMEDNAGAR SOLAPUR KASPL PROJECT |
01-06-2020 - 30-12-2020 |
TCP SUPPLY AND INSTALLATION MANMAD-YEWALA KM 350 TO 396 KM. TOTAL 46 KM WORK |
31 |
M/S INDIAN OIL CORPORATION LIMITED C/O MAS CONSTRUCTION |
IOCL REWA GA PART 1 PROJECT |
08.05.2020 - 08.05.2022 |
TEMPORARY CATHODIC PROTECTION SYSTEM SUPPLY AND SERVICE DESIGN, SUPPLY, INSTALLATION, TESTING, COMMISSIONING SYSTEM LAYING OF 3 LPE COATE CARBON STEEL PIPELINE IN GROUP R1: REWA GA PART 1 |
32 |
M/S INDIAN OIL CORPORATION LIMITED C/O POWER MECH PROJECTS LTD |
IOCL KOYALI- AHMEDNAGAR SOLAPUR KASPL PROJECT |
27-02-2020- 30-02-2020 |
10 BREZING KASPL SUPPLY & SERVICE AT GAIL PIPELINE CROSSING IN GUJARAT |
33 |
M/S INDAIN OIL TANKING |
IOT MUMBAI MAHARASTRA |
31-01-2020 - 31-02-2020 |
12 THERMIT WELD SUPPLY & SERVICE AT IOT MUMBAI MAHARASTRA |
34 |
M/S GAIL KERALA C/OKALPATARU POWER TRANSMISSION LIMITE |
GAIL INDIA LTD KERALA |
29-01-2020- 29-02-2020 |
50 NOS PINBREAZING AT GAIL LINE AFTER HYDRO TEST AT GAIL KERALA |
35 |
M/S IOCL REWA C/O M/S SHREE BALAJI ENGINEERING |
IOCL REVA M.P |
15.11.2019 - 15.11.2020 |
TCP DESIGN SUPPLY & SERVICE 7 KM REVA M.P |
36 |
M/S GAIL INDIA LTD C/O ABIRAM CONST RUCTION GUNA (MP) |
GAIL INDIA LTD BHARATPUR U.P |
05.08.2019- 30.12.2020 |
PCP DESIGN SUPPLY & SERVICE WORK GAIL GAS BHARATPUR U.P. |
37 |
M/S TORRENT GAYPAGLA SURART,GUJARAT C/O LINC DIGITAL |
PCP OF TORRENT GAYPAGLA, SURAT, GUJARAT |
09.07.2019 - 30.12.2020 |
Torrent PCP Design supply and installation of TR Unit Anod bed Testing and comissing TCI Project GAYPAGLA, SURAT |
38 |
M/S GAIL ORRISA C/O KALPATARU POWER TRANSMISSION LIMITE |
GAIL INDIA LTD ORRISA |
13-04-2019 30-12-2020 |
Supply OF THERMIT WELD POWDER |
39 |
M/s TORRENT GAS PVT LTD |
TORRENT DAHEJ GUJARAT |
11-04-2019 11-05-2019 |
IJ PCP BOUNDING AND TLP SERVICE TLP,ZINC, CABLE |
40 |
M/S GAIL ORRISA C/O KALPATARU POWER TRANSMISSION LIMITE |
GAIL INDIA LTD ORRISA |
17-03-2019 17-04-2019 |
CP MATERIALS MOLD&HALFCELL Supply |
41 |
M/S HINDUSTAN PETROLEUM CORPORATION LTD |
HINDUSTAN PETROLEUM CORPORATION LTD BAHADURGARH B HARIYANA |
14-02-2019- 14-06-2019 |
25 AJB SIFTING AND TERMINATION WITH TR UNIT TEST REPORT |
42 |
M/s ONGC C/O KALPATARU POWER TRANSMISSION LIMITED |
ONGC CIPL Survey AHMDABAD Asset |
04-02-2019 05-04-2019 |
160 KM CIPL Survey With Commissioning Report ONGC AHMDABAD Asset |
43 |
M/S ASPEN INFRASTRUCTURE LTD WAGHODIYA VADODARA (GUJARAT) |
ASPEN WAGHODIYA IJ WORK |
11-09-2018 12-12-2018 |
IJ PCP BOUND & PIPELINE PIANT PCP MATERIAL SERVICE |
44 |
ASPEN INFRASTRUCTURE LTD WAGHODIYA VADODARA (GUJARAT) |
ASPEN WAGHODIYA IJ WORK |
11-09-2018 12-09-2018 |
IJ PCP BOUND & PIPELINE PIANT PCP MATERIAL SUPPLY |
45 |
M/s TORRENT POWER LIMITED |
Torrent Power Water line 10.500 Km / Gas pipe line project Dahej 13.500 km 18’’ PCP Service |
24.07.2018 - 30.06.2019 |
TLP 04,KRIK CELL 02 nos, Zinc 20kg 04 nos ,pinbrezing 10 Nos,25 sq mm cable 100mtr,04 sq. mm cable 100mtr with HDPE pipe 50 Mtr. Service |
46 |
M/s GITL (GSPL Group )KALPATARU POWER TRANSMISSION LIMITED |
Work Order for Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer-In -Charge For Mallavaram -Bhopal- Bhilwara-Vijapur Pipeline Project For M/s GITL |
23.07.2018 - 30.12.2019 |
1060 Nos Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer-In -Charge For 305 KM Mallavaram -Bhopal- Bhilwara-Vijapur Pipeline Project For M/s GITL |
47 |
M/s GITL (GSPL Group ) C/O- M/s KALPATARU POWER TRANSMISSION LIMITED |
Work Order for Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer-In -Charge For Mallavaram -Bhopal- Bhilwara-Vijapur Pipeline Project For M/s GITL |
23.07.2018 - 30.12.2019 |
265 No's Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer-In -Charge For 305 KM Mallavaram -Bhopal- Bhilwara-Vijapur Pipeline Project For M/s GITL |
48 |
M/s GAIL (INDIA ) LIMITEDM/s CCS MUMBAI MAHARASTRA |
Work order for PIN BRAZING JOB |
02.09.2017 - 15.10.2017 |
20 Nos PIN BRAZING SUPPLY & INSTALLASTION |
49 |
M/s. CAIRN ENERGY LIMITEDC/O.M/s SOPAN O&M COMPANY PVT.LTD. |
Work order for PIN BRAZING JOB at Cairn - Badmer site |
06.11.2017 - 07.11.2017 |
20 Nos PIN BRAZING SUPPLY & INSTALLASTION |
50 |
M/s HINDUSTAN PETROLEUM CORPORATION LIMITED |
SUPPLY & INSTALLASTION JETTY PIPELINE 24” 11.500 KM MUNDRA PORT TO - ADANI PORT 3 No's Pipeline |
06.06.2017 - 30.06.2017 |
TLP 04 NOS, Zinc 20kg 04 NOS, Pinbrezing 16 NOS ,25 sq mm cable 200 mtr,04 sq mm cable 200 mtr, Permanent Ref. Cell 04 Nos ,Surge Drivetor 02 Nos SUPPLY & INSTALLASTION |
51 |
M/s GAIL (INDIA ) LIMITEDC/O -M/s KALPATARU POWER TRANSMISSION LIMITED |
Work Order for Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer-In -Charge For 157 KM Auraiya-Phulpur Project for M/s GAIL |
02.09.2017 - 15.08.2018 |
120 nos Pin Brazing with Pin for Temporary Cathodic Protection System required as per the system design, Specifications, drawings and directions of the Engineer-In -Charge For Auraiya-Phulpur Project for M/s GAIL |
52 |
M/s GAIL India Limited C/O- M/s KALPATARU POWER TRANSMISSION LIMITED |
Supply of C.P. Mold 6 SQ MM & 25 SQ MM Used for Auraya -Phulpur Pipeline project of M/s GAIL |
05.06.2017 - 30.07.2017 |
Supply of C.P. Mold 6 SQ MM & 25 SQ MM Used for Auraya -Phulpur Pipeline project of M/s GAIL |
53 |
M/s TORRENT POWER LIMITED |
Torrent Power Gas pipe line Project Dahej 13.500 km 18’’ Installation & commissioning ER Probe |
23.12.2016 - 30.03.2017 |
Installation & commissioning ER Probe |
54 |
M/s TORRENT POWER LIMITED |
Torrent Power Gas pipe line Project Dahej 13.500 km 18’’ PCP Material service |
10.08.2016 - 30.01.2017 |
TLP 03,KRIK CELL 03,Zinc 20kg 03,pinbrezing 12,25 sq mm cable 200mtr,04 sq mm cable 200mtr with HDPE pipe 50 mtr Service |
55 |
M/s TORRENT POWER LIMITED |
Torrent Power Gas pipe line Project Dahej 13.500 km 18’’ PCP Material supply |
10.08.2016 - 30.01.2017 |
TLP 03,KRIK CELL 03,Zinc 20kg 03,pinbrezing 12,25 sq mm cable 200mtr,04 sq mm cable 200mtr with HDPE pipe 50 mtr Supply |